Sail Dive Fish
Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

gudgeon

Designing the fuel system for the heater

December 22, 2014Matt 1 Comment

Fresh from a week-long trip to Ottawa (which helpfully rained freezing rain the whole time and reminded me why I do not live in Ottawa anymore) I have decided my goal is to finally, FINALLY finish the damn heater install. This… Continue reading →

Dickinson Diesel Install, Maintenance fuel, gudgeon, heater, hunter 36

Removing the teak hand rails

December 8, 2014Matt Leave a comment

As part of the effort to track down the mysterious leak over the desk, I’ve decided to rebed the teak hand rails on the cabin roof. The first step was to remove the little teak plugs. The best way I… Continue reading →

Maintenance gudgeon, hunter 36, railings, teak

Installing the downrigger: Mounting

December 7, 2014Matt 3 Comments

So I snagged a Scotty electric 1106 downrigger during a recent sale because I’m GOING TO CATCH A SALMON ONE DAY DAMMIT and today I had a bit of downtime and decided to mount it. First I used the plastic… Continue reading →

Fishing, Maintenance downrigger, gudgeon, hunter 36

Installing the heater Flue part a million – Finishing off the chimney install

December 6, 2014Matt 2 Comments

So the fiberglass attached backing wood finally dried, and it was time to drill the hole in it! This SUCKED AND TOOK AGES since the wood was really really hard. Eventually, after 3 battery pack swaps, I got through Next,… Continue reading →

Dickinson Diesel Install, Maintenance flue, gudgeon, heater, hunter 36

Installing the heater Flue part whatever: I am bad at fiberglassing

December 4, 2014Matt 3 Comments

So my plan didn’t work, to build up the lip using marine-tex, so my next thought was to use some wood as the primary platform and build up to it. So I got some pretty sweet free wood from work,… Continue reading →

Dickinson Diesel Install, Maintenance fiberglassing, flue, gudgeon, heater, hunter 36

Searching for the cure

December 2, 2014Matt 2 Comments

So there were like a billion ‘cure’ jokes I could have put here but I decided on the one above. You are welcome. Long and short of it, temperatures have plummeted and it’s too cold for the marine-tex to fully… Continue reading →

Dickinson Diesel Install, Maintenance gudgeon, hunter 36, marine-tex

Installing the heater Flue part 2: Brrrrrrr

November 30, 2014Matt 2 Comments

So I woke up the next morning to find a small hole from the centre of the hole saw in the ceiling and snow on the ground GREAT. So I carried on with the hole saw and managed to finally get… Continue reading →

Dickinson Diesel Install, Maintenance epoxy, fiberglassing, flue, gudgeon, hunter 36, marine-tex

Installing the heater Flue part 1: Making a mess

November 28, 2014Matt 1 Comment

So with all the parts of my heater in place, it was time to install the Flue! First, I marked off the length I needed to saw off the pipe.   Then I cut the pipe with my beasty electric saw… Continue reading →

Dickinson Diesel Install, Maintenance flue, gudgeon, hole saw, hunter 36

Post navigation

← Older Articles
Newer Articles →

Past Posts

Picture Feed

Follow on Instagram

Archives

© 2026 Sail Dive Fish. All rights reserved.
Fashionista by aThemes