Sail Dive Fish
Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

Maintenance

THERE CAN ONLY BE ONE

May 1, 2014Matt 2 Comments

Look what I found floating in the dock next to mine 😐   More impetus to change the name

Maintenance gudgeon, hunter 36, name

Artists Impression of me looking at the old wiring

May 1, 2014Matt 1 Comment

  (Image from http://threewordphrase.com/)

Maintenance gudgeon, hunter 36, wiring

Still cleanin’ on

April 27, 2014Matt Leave a comment

Except now I’ve done the whole V Berth, Bathroom and Closet. Next is the main cabin – I’ve taken the time to start pulling out wire that isn’t hooked up to anything – so far I’ve got this out And… Continue reading →

Maintenance cleaning, gudgeon, hunter 36, wiring

Upholstery and Wiring

April 23, 2014Matt Leave a comment

I tried to get my covers off the cushions, and horribly failed. So I won’t be able to wash them really, so I am going to have them redone – and will get the V-Berth foam replaced. It’s probably going… Continue reading →

Maintenance cushions, electronics, gudgeon, hunter 36, wiring

Still cleaning

April 21, 2014Matt Leave a comment

Ugh. I hate it so. But look at this bathroom cabinet! (before pic is in previous post) On another note, I tried to take the cushion covers off to wash them and was unsuccessful. I think I’ll have to get… Continue reading →

Maintenance cleaning, gudgeon, hunter 36

Update

April 20, 2014Matt Leave a comment

So I haven’t updated for a while, and the reason for that is that I got onto the ‘Cleaning’ part of the project. I’m really bad at cleaning, so ‘cleaning’ meant ‘do 5 minutes of scrubbing and then take a… Continue reading →

Maintenance cleaning, gudgeon, hunter 36, marine life, plumbing

The date is set

April 14, 2014Matt 2 Comments

and it’s june 1st. I’ve handed in my notice on my apartment so even if I am going to have to live in a sleeping bag eating baked beans out of the tin, that’s the date I move onto the… Continue reading →

Maintenance gudgeon, hunter 36, marinas, moving

Rebedding anchor locker drain hole II

April 7, 2014Matt Leave a comment

I went back today and attached the drain pipe   I think I’ll have to end up shortening it so it forms a slope down to the drain, but that will do for now.

Maintenance gudgeon, hunter 36, plumbing

Post navigation

← Older Articles
Newer Articles →

Past Posts

Picture Feed

Panama Canal Part 2 Panama Canal Part 2
A couple of weeks ago I made it through the Panama A couple of weeks ago I made it through the Panama Canal, which was a pretty crazy 17 hour day. There are 6 locks in total, divided into 3 groups - 3 locks are at the start, then you end up driving through a manmade channel for miles, before emerging into a manmade lake.

The whole day was so full of huge ships and challenging situations but the feeling of emerging into a NEW OCEAN on the other side is pretty unbelievable

#sailing #sailboat
One of my favourite animals ever, and everywhere h One of my favourite animals ever, and everywhere her in Panama City
Made to Panama City, my last stop in the Pacific f Made to Panama City, my last stop in the Pacific for quite some time. Last 100 miles were upwind against heavy current but it was ok, even the fearsome Punta Mala was tame. By far the scariest bit was threading my way through the shipping anchorage outside the canal,  the traffic was very active and a couple of times I had to get out the way sharpish

Next, the canal!
Follow on Instagram

Archives

© 2026 Sail Dive Fish. All rights reserved.
Fashionista by aThemes