Upholstery and Wiring

I tried to get my covers off the cushions, and horribly failed. So I won’t be able to wash them really, so I am going to have them redone – and will get the V-Berth foam replaced. It’s probably going to cost a lot – but it’s going to look so nice once it’s done.

I also had an electrician come look at the wiring. He said the AC wiring would take around 30 hours to replace properly, and the DC wiring even longer. My existing panel is ok though – which will save about a $1000 bucks – I do want to replace all the breakers though, and add meters on there, so I will have to cost up both options.

Looks like I have a lot of work ahead… (at least it’s not f’ing cleaning)

Matt