Sail Dive Fish

Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

Hebridean Wind Vane Construction: Part 3 (Piece 13)

December 7, 2015Matt Leave a comment

Basically I think this is my life from now on. HOPE YOU LIKE READING ABOUT FIDDLY BITS OF METAL. Actually I was originally going to triumphantly write about how i got my discount Raymarine speed transducer to work on NMEA2000,… Continue reading →

Hebridean Construction, Maintenance gudgeon, hebridean, hunter 36, windvane

Hebridean Wind Vane Construction: Part 2 (piece 4a+b)

December 6, 2015Matt Leave a comment

After finishing the jig in part one, I decided to carry on and make the first actual wind vane part (the jig I made is just to help in the construction). I decided to start with parts 4A and 4B,… Continue reading →

Hebridean Construction, Maintenance gudgeon, hebridean, hunter 36, windvane

Hebridean Wind Vane Construction: Part 1 (Piece 1)

December 2, 2015Matt Leave a comment

Today I started construction on my Hebridean Wind Vane I maybe feel I bit off a bit more than I can chew as it appears really pretty complicated, but I will slowly work away at it and hopefully end up… Continue reading →

Hebridean Construction, Maintenance gudgeon, hebridean, hunter 36, windvane

Autopilot planning

November 30, 2015Matt 2 Comments

After a couple of… hairy solo excursions in stronger wind, I bumped an autopilot up to the top of my list. Now, being a 36′ foot with a wheel, there were two main types of options. An above-floor ‘wheel pilot’ like http://www.raymarine.com/view/?id=380… Continue reading →

Autopilot Install, Maintenance AC12, autopilot, DD15, gudgeon, H2183, hunter 36

I finished installing all the new portholes!

November 26, 2015Matt 4 Comments

As of around ten minutes ago, I finished the final porthole. I am so relieved to finally finish this project, especially since it was really cold last night and have a porthole sized hole in the boat (as I had… Continue reading →

Maintenance, Porthole Replacement gudgeon, hunter 36, new found metals, PARTY TIME BITCHES, porthole, portholes, relief

Thanksgiving Trip*

November 24, 2015Matt 3 Comments

*Ok, week before thanksgiving. American thanksgiving that is, as the Canadian one already happened 6 weeks ago. Whatever. So my friend Elyess was hosting a thanksgiving dinner (see above) at her house on Orcas Island and that sounded like a… Continue reading →

Sailing bird bomb, gudgeon, hunter 36, orcas island, san jaun, sunset

Small bits and pieces

November 24, 2015Matt 3 Comments

With plans to go to Orcas Island on the Sunday, the Saturday was spent doing little bits and pieces that I’ve been putting off for a while. First up, getting new oars. My old ones were sadly lost at sea so… Continue reading →

Maintenance gudgeon, hunter 36, jerry can, oars, tachometer, vent

Traveler Upgrade

November 22, 2015Matt Leave a comment

One of the things on my list was to upgrade my traveler. It was still the original one which was a pretty anemic 2:1, made worse by the fact a bunch of plastic on the blocks had all broken. This… Continue reading →

Maintenance gudgeon, hunter 36, traveler, traveler car

Post navigation

← Older Articles
Newer Articles →

Past Posts

Picture Feed

Big 'ol Grizz at @nimmobayresort Big 'ol Grizz at @nimmobayresort
Follow on Instagram

Archives

© 2026 Sail Dive Fish. All rights reserved.
Fashionista by aThemes