Laziness
The top three things I need to do are – waterproof engine hatch – get cupboards made – rig up wireless booster and antenna …. and I haven’t done anything on them. I’ve been feeling exceptionally unmotivated this week in… Continue reading
The top three things I need to do are – waterproof engine hatch – get cupboards made – rig up wireless booster and antenna …. and I haven’t done anything on them. I’ve been feeling exceptionally unmotivated this week in… Continue reading
One of the things on my ‘non-urgent’ list was to replace all my lights with LEDs for two reasons 1) They draw 1/5 of the power 2) They are extremely relialbe. After doing a ton of research, I finally went… Continue reading