Hebridean arrived
As mention hereĀ I ordered a wind vane called a Hebridean and it arrived today in kit form. Looking at the instructions it’s gonna take me a fantastically long time to assemble – WINTER PROJECT methinks. At 1/8 the...
Read Moreby Matt | Sep 23, 2015 | Hebridean Construction, Maintenance | 4
As mention hereĀ I ordered a wind vane called a Hebridean and it arrived today in kit form. Looking at the instructions it’s gonna take me a fantastically long time to assemble – WINTER PROJECT methinks. At 1/8 the...
Read Moreby Matt | Sep 10, 2015 | Hebridean Construction, Maintenance | 3
One of the things I need is some kind of self steering, so I don’t have to sit at the wheel for hours on end. There are two main types – an electric autopilot that connects to your chartplotter and can steer compass...
Read More