Sail Dive Fish
Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

gudgeon

Creeeeeaaaaaaaaakkkkkk

June 20, 2014Matt Leave a comment

One thing I noticed was that in additional to the usual ‘boat sounds’, there was SOMETHING that was making the most godawful creaking/rubbing sound, right above my head in the V berth. After investigating I determined it was probably the… Continue reading →

Maintenance dock lines, gudgeon, hunter 36

Cushions!

June 18, 2014Matt 1 Comment

So yeah! My V berth cushions have two out of the 3 done! And one of the sofas has the bottom cushions done! The colour and the material looks really good – I basically followed the advice of the lady… Continue reading →

Maintenance cushions, gudgeon, hunter 36

Removing the old refrigeration system

June 9, 2014Matt Leave a comment

Today, I decided to pull out the old refrigeration system. It was rusted to SHIT, and I had no idea if it even worked or not – and it looked like it wasn’t very efficient. Also, I am going to… Continue reading →

Maintenance gudgeon, hunter 36, refrigeration

First test of crab trap

June 8, 2014Matt Leave a comment

  To avoid doing work I bought a new crabtrap – a Flexfit one, a commercial size trap that folds into a tiny bag – ideal for a sailboat! This was the first test.

Fishing crabbing, flex-fold, gudgeon, hunter 36

Installing the Galvanic Isolator and finishing off the AC

June 6, 2014Matt 1 Comment

With the panel mounted, and all the outlets wired, the only thing left to do was to install the galvanic isolator and connect the outlet wires to the panel. First, the GI, which looks like this.   This interrupts the… Continue reading →

Maintenance AC, galvanic isolator, gudgeon, hunter 36, outlets, panel, wiring

Moving

June 4, 2014Matt 2 Comments

I’ve been so busy I haven’t had a chance to update this until now. When I said I had 3 days until I moved – I actually only had two. I found out on Friday night that I had to… Continue reading →

Maintenance gudgeon, hunter 36, move, moving

Mounting the panel – part 3

June 2, 2014Matt Leave a comment

Next up – sanding and painting   I didn’t take many photos here, because I was too busy trying not to drip paint everywhere. Here you can see i’ve taped off the parts I don’t want painted however. Chloe did… Continue reading →

Maintenance AC, gudgeon, hunter 36, painting, panel

Three days left until move in date

May 30, 2014Matt Leave a comment

Am I ready? No. I have no power, running water, cushions or refrigeration. Or heat. However, I am hoping to get AC power by then, and then DC power shortly afterwards, and then the plumbing shouldn’t take too long… On… Continue reading →

Maintenance gudgeon, hunter 36, move

Post navigation

← Older Articles
Newer Articles →

Past Posts

Picture Feed

Follow on Instagram

Archives

© 2026 Sail Dive Fish. All rights reserved.
Fashionista by aThemes