Sail Dive Fish
Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

Maintenance

First time using (incorrectly) the spinnaker and getting the kicker working

April 4, 2016Matt 4 Comments

This weekend it was nice out, so I decided to work on the spinnaker pole. It was a second hand one and was a foot or so too long, making it tricky to handle. First I cut it down to… Continue reading →

Maintenance, Sailing dinghy, failure, gudgeon, hunter 36, outboard, spinnaker, spinnaker pole

Quick jaunt to Orcas Island and a porpoise encounter!

March 20, 2016Matt 2 Comments

I needed to pick up some stuff from Orcas island, namely Drag link for autopilot (last piece I need!) Curtain stuff to finish all 9 remaining curtains a safety cuff thing to put on prop shaft in case of gearbox… Continue reading →

Maintenance, Sailing gudgeon, hunter 36, marine life, orcas, porpoises

Attempting to make new curtains

March 10, 2016Matt 6 Comments

So the other day I attempted to make a curtain for the first time (not counting the time where I attempted to by hand, cut myself and broke my phone by bleeding on it). Note the word ‘attempting’. First attempt,… Continue reading →

Maintenance curtains, gudgeon, hunter 36, sewing

Redoing the steering/engine cables: Part 3

February 28, 2016Matt 2 Comments

Last bit of this project – replacing the throttle and shifter cables. Much like almost all trilogies, this post will be the worst one in the series. I am very tired. My new cables were picked up – here are… Continue reading →

Maintenance gudgeon, hunter 36, shifter, shifter cable, throttle cable

Redoing the steering/engine cables: Part 2

February 26, 2016Matt Leave a comment

So having pulled everything out, the trick was now to put everything back. Originally I was worried that all the parts were going to be hard to find, but they were all in the local marine store. Who also lent… Continue reading →

Maintenance gudgeon, hunter 36, nicopress, steering, steering cables

Redoing the steering/engine cables: Part 1

February 23, 2016Matt Leave a comment

Part one, aka pulling all the stuff out. ‘But Matthew’, I hear you cry, ‘didn’t you just spend a ton of time messing around with cables when you were hauled out?’ Nice memory, and yes I did. However, that was… Continue reading →

Maintenance gudgeon, hunter 36, shifter cable, steering, steering cable, throttle cable

Haulout 2016 Part 2: Repainting the bottom anti-fouling and home!

February 11, 2016Matt 6 Comments

After fiddling around with the steering system, the next day was redoing the bottom paint. Bottom paint is a certain type that contains copper, and is designed to stop marine life attaching itself to the bottom of your boat, slowing… Continue reading →

Maintenance anti fouling, bottom painting, gudgeon, haulout, hunter 36, sunset

Haulout 2016 Part 1: Replacing the rudder stuffing box hose and repacking rudder stuffing box

February 10, 2016Matt 7 Comments

Now that title has driven away everyone not looking for tips on how to do a particular procedure on a 36′ cherubini hunter, lets get to it. It was time for the annual haulout, a procedure that last time was… Continue reading →

Maintenance gudgeon, haulout, hose, hunter 36, quadrant, rudder, stuffing box

Post navigation

← Older Articles
Newer Articles →

Past Posts

Picture Feed

Follow on Instagram
© 2025 Sail Dive Fish. All rights reserved.
Fashionista by aThemes