Mast work (part 4)
Now, with all the hardware and conduit installed, it was time to run the wires. This was a royal pain in the arse. First I removed all the old wire Then I laid out all the wires, there were 9… Continue reading
Now, with all the hardware and conduit installed, it was time to run the wires. This was a royal pain in the arse. First I removed all the old wire Then I laid out all the wires, there were 9… Continue reading