Sail Dive Fish
Life on the water
Menu Close
  • Home
  • Find Sooner
  • Photos
  • About Me
  • Boat One (Gudgeon)
    • About Gudgeon
    • Projects
      • LiFePo4 Battery Install
      • Porthole Replacement
      • ICOM 802 SSB Install
      • Autopilot Install
      • Mast Wiring Refit
      • Dickinson Diesel Install
      • Hebridean Construction
      • Yanmar 2QM20
  • The Start
  • Contact

galvanic isolator

Installing the Galvanic Isolator and finishing off the AC

June 6, 2014Matt 1 Comment

With the panel mounted, and all the outlets wired, the only thing left to do was to install the galvanic isolator and connect the outlet wires to the panel. First, the GI, which looks like this.   This interrupts the… Continue reading →

Maintenance AC, galvanic isolator, gudgeon, hunter 36, outlets, panel, wiring

Past Posts

Picture Feed

Follow on Instagram
© 2025 Sail Dive Fish. All rights reserved.
Fashionista by aThemes